OEM/ODM Factory Mini Microwave Laboratory Machine - Industrial Microwave Spice Red Chilli Powder Flavoring/ Seasoning Sterilization and Drying Machine – Dongxuya
OEM/ODM Factory Mini Microwave Laboratory Machine - Industrial Microwave Spice Red Chilli Powder Flavoring/ Seasoning Sterilization and Drying Machine – Dongxuya Detail:
Specification
Model |
Power (kw) |
Dehydration Capacity |
Sterilization Capacity |
Size (L X W X H) (mm) |
DXY-12 |
12 |
10 – 12 kg/h |
100 – 150 kg/h |
6800x850x2300 |
DXY-20 |
20 |
15 – 20 kg/h |
180 – 250 kg/h |
9300x1200x2300 |
DXY-30 |
30 |
25 – 30 kg/h |
280 – 350 kg/h |
9300x1500x2300 |
DXY-40 |
40 |
35 – 40 kg/h |
380 – 450 kg/h |
9300x1600x2300 |
DXY-50 |
50 |
45 – 50 kg/h |
480 – 550 kg/h |
11600x1500x2300 |
DXY-80 |
80 |
75 – 80 kg/h |
780 – 850 kg/h |
13900x1800x2300 |
DXY-100 |
100 |
95 – 100 kg/h |
980 – 1050 kg/h |
16500x1800x2300 |
DXY-150 |
150 |
140 – 150 kg/h |
1480 – 1550 kg/h |
24400x1800x2300 |
DXY-200 |
200 |
190 – 200 kg/h |
1980 – 2050 kg/h |
31300x1800x2300 |
Detailed Parts of Microwave Sterilization and Drying Machine
Toshiba and Samsung high-quality magnetrons are used, and open and closed cooling towers are equipped, so that the service life of the equipment is longer.
Product detail pictures:
Related Product Guide:
We also offer product sourcing and flight consolidation services. We have our own factory and sourcing office. We can provide you with almost every type of product related to our product range for OEM/ODM Factory Mini Microwave Laboratory Machine - Industrial Microwave Spice Red Chilli Powder Flavoring/ Seasoning Sterilization and Drying Machine – Dongxuya , The product will supply to all over the world, such as: Czech Republic, Lesotho, Brunei, Our company has abundant strength and possesses a steady and perfect sales network system. We wish we could establish sound business relationships with all customers from at home and abroad on the basis of mutual benefits.
By Yannick Vergoz from Stuttgart - 2018.11.22 12:28
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By mary rash from Romania - 2018.08.12 12:27